A new storage tunnel is one step closer to completion after MudHoney, a tunnel boring machine, finished digging its way from Ballard to Wallingford Monday.
The construction is a part of the, which looks to reduce this waste pollution in the Lake Washington Ship Canal, Salmon Bay, and Lake Union. The total cost for the overall Ship Canal Water Quality Project is between $615 to $650 million dollars.
During a heavy storm, the new tunnel will capture and temporarily store more than 29 million gallons of untreated stormwater and sewage until the treatment plant is ready for it.Next up on the project is a diversion structure near Stone Way N and N 34th Street, which started in April and will be under construction for the next couple of months, according to the
Indonesia Berita Terbaru, Indonesia Berita utama
Similar News:Anda juga dapat membaca berita serupa dengan ini yang kami kumpulkan dari sumber berita lain.
Tunnel boring machine ‘MudHoney’ reaches destination in WallingfordMudHoney, an 18-foot diameter tunnel boring machine, finished its journey in Seattle from Ballard to Wallingford on Monday.
Baca lebih lajut »
Inside Bob Ballard's Titanic Wreckage Discovery in 1985 (Flashback)The explorer spoke with ET about locating the ship's final resting place and capturing footage of its debris field on the seafloor.
Baca lebih lajut »
Flooding, hail, wind: what to expect as heavy rain moves through central Pa. on MondayUp to 50 mph winds and penny-sized hail are possible during Monday afternoon and evening storms, forecasters said.
Baca lebih lajut »
Search for missing rafter in Glenwood Canyon continues MondayThe search for a missing father continues in Glenwood Canyon after his raft capsized, the Garfield County Sheriff’s Office said.
Baca lebih lajut »
Weather Alert: Watches, warnings issued as line of storms impact Philadelphia area MondayThe National Weather Service has issued multiple watches and warnings associated with a line of severe weather moving through the area Monday afternoon.
Baca lebih lajut »