Plan for full closure of I-10 for Broadway Curve Improvement Project this weekend

Indonesia Berita Berita

Plan for full closure of I-10 for Broadway Curve Improvement Project this weekend
Indonesia Berita Terbaru,Indonesia Berita utama
  • 📰 abc15
  • ⏱ Reading Time:
  • 53 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 25%
  • Publisher: 63%

Plan for full closure of I-10 for Broadway Curve Improvement Project this weekend abc15

On their website, ADOT reported the following closures and restrictions:

Eastbound I-10 closed between SR 143/48th Street and US 60 from 10 p.m. Saturday to 10 a.m. Sunday for the I-10 Broadway Curve Improvement Project. Eastbound I-10 on-ramps at 40th Street and Broadway Road also closed. Northbound I-17 closed between Union Hills Drive and Pinnacle Peak Road from 10 p.m. Friday to 5 a.m. Monday for pavement improvement project. Northbound I-17 on-ramps between Thunderbird and Bell roads and at Yorkshire Drive and Deer Valley Road closed.

Westbound Loop 303 closed between I-17 and Lake Pleasant Parkway from 10 p.m. Friday to 5 a.m. Monday for construction. I-17 off-ramps at Loop 303 restricted with access to Sonoran Desert Drive . I-17 on-ramps at Loop 303 will remain open. Northbound Loop 101 narrowed to one lane overnight between Thunderbird Road and 75th Avenue in the northwest Valley from 9 p.m. to 5 a.m. Sunday through Thursday nights for pavement maintenance. Please allow extra travel time and be prepared to slow down and merge safely when approaching and traveling through all work zones.

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

abc15 /  🏆 263. in US

Indonesia Berita Terbaru, Indonesia Berita utama

Similar News:Anda juga dapat membaca berita serupa dengan ini yang kami kumpulkan dari sumber berita lain.

U.S.’ first interstate EV charging network for semi-trucks to connect California port with TexasU.S.’ first interstate EV charging network for semi-trucks to connect California port with TexasHigh-powered EV charging centers, 150 miles apart, will populate a busy corridor for semi-trucks along Interstate 10 in the Southwest U.S. Medium- and heavy-duty trucks account for about 29% of highway emissions, the Department of Energy says.
Baca lebih lajut »

San Diego faces Nov. 1 deadline for long-term management plan at Point La JollaSan Diego faces Nov. 1 deadline for long-term management plan at Point La JollaSierra Club Seal Society advocates continuing the current seasonal closure until a plan is set
Baca lebih lajut »

Interstate 10 lane restrictions planned in Buckeye this weekendInterstate 10 lane restrictions planned in Buckeye this weekend
Baca lebih lajut »

Westbound I-10 off- and on-ramps at Watson Road in Buckeye closed into November | ADOTWestbound I-10 off- and on-ramps at Watson Road in Buckeye closed into November | ADOT
Baca lebih lajut »



Render Time: 2025-03-10 12:48:12