Libya's Sharara oilfield partially resumes after abducted ex-minister freed

Indonesia Berita Berita

Libya's Sharara oilfield partially resumes after abducted ex-minister freed
Indonesia Berita Terbaru,Indonesia Berita utama
  • 📰 Reuters
  • ⏱ Reading Time:
  • 26 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 14%
  • Publisher: 97%

Production at Libya's Sharara oilfield, which was shut on Thursday following the abduction of a former finance minister, has partially resumed at 30,000 barrels per day out of its usual 290,000, two Sharara oil engineers said on Saturday.

The Sharara field, one of Libya's largest production areas with a capacity of about 300,000 barrels per day, has been a frequent target for several political reasons and demands by local protesters. The field is located in Murzuq basin in southeast Libya. It is run by the state oil firm NOC via Acacus company with Spain's Repsol , France's Total , Austria's OMV , and Norway's Equinor .

Sharara and two other oilfields closed in a protest by al-Zawi tribe in response to the kidnapping of former finance minister Faraj Bumatari. In a message to Reuters on Saturday, the tribe's leader Al-Senussi Al-ahlaiq confirmed the release of Bumatari, who was kidnapped after arriving at Mitiga airport on Tuesday.Libya's oil minister Mohamed Aoun told Dubai-based Asharq TV on Saturday that the oilfields' closure had cost the North African country the production of 340,000 barrels.

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

Reuters /  🏆 2. in US

Indonesia Berita Terbaru, Indonesia Berita utama

Similar News:Anda juga dapat membaca berita serupa dengan ini yang kami kumpulkan dari sumber berita lain.

Chipotle tests 'Autocado,' a robot to speed up guacamole productionChipotle tests 'Autocado,' a robot to speed up guacamole production'Autocado' is a Chipotle robot designed to perform the more tedious tasks of creating the chain's guacamole, including cutting, coring and peeling avocados.
Baca lebih lajut »

Mets need more production from Pete Alonso and Jeff McNeilMets need more production from Pete Alonso and Jeff McNeilThe right side of the Mets’ infield was anything but consistent in the first half.
Baca lebih lajut »

Apple paying TSMC special rate for 3nm A17 Bionic, M3 production as yield rates hits 55%Apple paying TSMC special rate for 3nm A17 Bionic, M3 production as yield rates hits 55%TSMC's yield rate for its 3nm production (mostly for Apple) is currently at 55% with Apple not being charged standard pricing until yields hit 70%.
Baca lebih lajut »

Chipotle tests 'Autocado,' a robot to speed up guacamole production | CNN BusinessChipotle tests 'Autocado,' a robot to speed up guacamole production | CNN BusinessYour Chipotle guacamole may soon be prepared by a robot. Meet “Autocado,” a Chipotle robot designed to perform the more tedious tasks of creating the chain’s guacamole, including cutting, coring, and peeling avocados.
Baca lebih lajut »

‘Deadpool 3’ Stops Production Due to SAG-AFTRA Strike‘Deadpool 3’ Stops Production Due to SAG-AFTRA Strike“Deadpool 3” has stopped filming as the SAG-AFTRA strike gets underway, with performers joining Writers Guild of America members on the picket lines. The Marvel sequel is one of the fir…
Baca lebih lajut »



Render Time: 2025-03-10 18:29:54