Iris Energy Turns On 41MW of Bitcoin Mining Machines Ahead of Schedule

Indonesia Berita Berita

Iris Energy Turns On 41MW of Bitcoin Mining Machines Ahead of Schedule
Indonesia Berita Terbaru,Indonesia Berita utama
  • 📰 CoinDesk
  • ⏱ Reading Time:
  • 32 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 16%
  • Publisher: 63%

.irisenergyco doubled its operating hashrate to 2.3 EH/s after completing a bitcoin mining facility in British Columbia, Canada ahead of schedule. egreechee reports

Iris Energy energized 41 megawatts of Bitcoin mining machines in British Columbia, Canada more than a month ahead of schedule.

The addition brings the company's hashrate, or computing power on the bitcoin network, to 2.3 exahash/second , it said in a. Another 1.4 EH/s, requiring 50MW of energy capacity, also in British Columbia, is scheduled to be up and running by the end of September, it said. Rack space has been a major constraint for bitcoin miners, many of whom have received mining rigs but have nowhere to plug them in due to construction delays.

Iris Energy"continues to work through deployment options for its remaining 2.3 EH/s of miners," including 1.7 EH/s of Bitmain Antminer S19j Pros itRead more about

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

CoinDesk /  🏆 291. in US

Indonesia Berita Terbaru, Indonesia Berita utama

Similar News:Anda juga dapat membaca berita serupa dengan ini yang kami kumpulkan dari sumber berita lain.

David McCormick turns his energy to boosting former opponent Mehmet OzDavid McCormick turns his energy to boosting former opponent Mehmet OzHOMESTEAD, Pennsylvania — Debbie Phillippi and her friends loved businessman David McCormick when he was running for the Republican nomination for U.S. Senate in Pennsylvania this past spring. When he lost, all of them, she said, were very disappointed.
Baca lebih lajut »

L2 Scaling Solution Arbitrum Schedules Nitro Rollup Stack Upgrade for August 31 – Bitcoin NewsL2 Scaling Solution Arbitrum Schedules Nitro Rollup Stack Upgrade for August 31 – Bitcoin NewsArbitrumOne, the layer two (L2) Ethereum scaling solution, announced the protocol will implement a significant upgrade called Nitro in 25 days. Arbitrum
Baca lebih lajut »

Brazilian Congress Fails to Vote on Cryptocurrency Bill, Next Discussion Scheduled for September – Regulation Bitcoin NewsBrazilian Congress Fails to Vote on Cryptocurrency Bill, Next Discussion Scheduled for September – Regulation Bitcoin NewsThe Brazilian Congress, which had slated for this week the discussion and a possible vote of the proposed cryptocurrency bill, sidelined it to deal with other issues.
Baca lebih lajut »

National AG group refuses to disclose info driving GOP allegations of left-wing biasNational AG group refuses to disclose info driving GOP allegations of left-wing biasThe National Association of Attorneys General is refusing to release information pertaining to Republican accusations that the group has turned into an unaccountable left-wing litigation machine.
Baca lebih lajut »

Police in Kazakhstan Arrest Gang Forcing IT Specialists to Run Crypto Farms – Mining Bitcoin NewsPolice in Kazakhstan Arrest Gang Forcing IT Specialists to Run Crypto Farms – Mining Bitcoin NewsKazakhstan has detained the members of a crime group suspected of forcing IT experts into operating underground facilities for crypto mining.
Baca lebih lajut »

Fisker Ocean Electric SUV Prototypes Already Built Ahead of Production StartFisker Ocean Electric SUV Prototypes Already Built Ahead of Production StartMagna completes the first 55 pre-production prototypes of the upcoming Fisker Ocean EV, just ahead of the scheduled production start this fall.
Baca lebih lajut »



Render Time: 2025-04-01 18:40:20