‎CoinDesk Podcast Network: BREAKDOWN: Powell Finally Talks Recession on Apple Podcasts

Indonesia Berita Berita

‎CoinDesk Podcast Network: BREAKDOWN: Powell Finally Talks Recession on Apple Podcasts
Indonesia Berita Terbaru,Indonesia Berita utama
  • 📰 CoinDesk
  • ⏱ Reading Time:
  • 1 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 4%
  • Publisher: 63%

Federal Reserve Chairman Jerome Powell has been testifying before Congress for two days. NLW highlights the key lines of questioning and insights provided by the testimony.

In testimony on the Hill, the Fed chairman is grilled about whether interest rate increases are going to cause an economic decline.In testimony on the Hill, the Fed chairman is grilled about whether interest rate increases are going to cause an economic decline.

Berita ini telah kami rangkum agar Anda dapat membacanya dengan cepat. Jika Anda tertarik dengan beritanya, Anda dapat membaca teks lengkapnya di sini. Baca lebih lajut:

CoinDesk /  🏆 291. in US

Indonesia Berita Terbaru, Indonesia Berita utama

Similar News:Anda juga dapat membaca berita serupa dengan ini yang kami kumpulkan dari sumber berita lain.

Fed's Powell facing rising criticism for inflation misstepsFed's Powell facing rising criticism for inflation misstepsFederal Reserve Chair Jerome Powell won praise for his deft leadership during the maelstrom of the pandemic recession.
Baca lebih lajut »

AUD/USD tumbles below 0.6920 as market mood sours, Fed Powell eyedAUD/USD tumbles below 0.6920 as market mood sours, Fed Powell eyedThe AUD/USD pair has witnessed a steep fall after slipping below the round-level support of 0.6940 in the Asian session. The asset is expected to disp
Baca lebih lajut »

US Dollar Index: Bulls regain control and target 105.00, focus on PowellUS Dollar Index: Bulls regain control and target 105.00, focus on PowellThe greenback, in terms of the US Dollar Index (DXY), regains the smile and approaches to the 105.00 mark on Wednesday. US Dollar Index looks to Powel
Baca lebih lajut »

Treasury yields fall as stocks stumble ahead of testimony by Fed's PowellTreasury yields fall as stocks stumble ahead of testimony by Fed's PowellTreasury yields pull back Wednesday ahead of the first of two days of congressional testimony by Federal Reserve Chair Jerome Powell.
Baca lebih lajut »

What Cramer is watching Wednesday — Powell on the Hill, Jim in the metaverseWhat Cramer is watching Wednesday — Powell on the Hill, Jim in the metaverseStocks are poised for a lower open following Monday's rebound.
Baca lebih lajut »

USD/CAD clings to gains post-Canadian CPI, remains below 1.3000 ahead of PowellUSD/CAD clings to gains post-Canadian CPI, remains below 1.3000 ahead of PowellThe USD/CAD pair maintained its bid tone through the early North American session and was last seen trading around the 1.2980 region, just a few pips
Baca lebih lajut »



Render Time: 2025-03-02 23:56:14